Pharmaceutical & Laboratory
Severn
Trent Laboratories New Environmental Laboratory Programming
lead
the programming for 22,500 SF of environmental testing laboratory
space in a tenant fit-up project. Analyzed laboratory sample process
flow, and prepared a ”bench-foot” program reflecting an optimized
process configuration. Conducted the work through
Freeman-French-Freeman Architects.
Johnson & Johnson Ortho-Clinical Diagnostics
Donor Screening / Gel
Line Conceptual Planning
Analyzed configuration of existing laboratory processes;
created detailed process-based program and conceptual plan to
assess feasibility of projected 19,000 SF lab and associated
automated filling line for the production and fabrication of blood
donor screening chemistry and ELISA arrays. Projected cost $6.6
million for substantial demolition, renovation and relocations.
Johnson & Johnson Ortho-Clinical Diagnostics
Technology Transfer
Laboratory Facilities Upgrade Planning
Analyzed process flow and
program needs of a 4,486 SF pilot diagnostic testing laboratory, and
prepared alternate concepts for configuration improvement.
Johnson & Johnson Ortho-Clinical Diagnostics
RhoGAM Facility
Upgrade Planning
Analyzed the process flow and program requirements
of an 8,880 SF drug production laboratory. Developed conceptual
layouts to support process improvement including stricter
“clean-to-cleaner” work flow and distinct separation of production
stages, with separate, physically sequenced reagent preparation,
testing and equipment cleaning areas. Administration was separated
from production. Prepared material for CBE-30 filing.
Wyeth Pharmaceuticals Phase 1 Part 1 Site Master Plan Development
Incremental development of Wyeth’s million SF facility at Rouses Point
had resulted in inefficiencies in layout and operations. A
Site Master Plan had been prepared to address these issues. Stenford Associates was retained, in conjunction with
Hallam-ICS, to develop the Phase One concept, which Wyeth Facilities
saw as crucial to the success of subsequent stages. The resulting
plan defined improved site and internal circulation, increased GMP
and non-GMP separation, and improved future expansion capability.
Work included multiple user group interviews, analysis of needs,
programming, detailed conceptual layout and capital cost
estimating.
Wyeth Pharmaceuticals Records Retention Center Feasibility Study
Analyzed consolidation of storage, management and tracking of FDA
compliance documentation from twenty-four departments into a single cGMP compliant location at the Rouses Point Facility. Project
included benchmarking best practices, archive requirements for
environmental controls, detailed site assessment, interviews and
programming; preparation of alternate conceptual plans and budgets,
including storage system. Proposed project would be 17,900 SF.
Prepared with Hallam-ICS.
State of Vermont Health Dept. & Dept. of Public Safety
Laboratory
Co-location Feasibility Study
Programming and issue analysis of the
feasibility of co-locating or combining the operations of the
state's public health and crime laboratories. The study included
detailed space program and narrative for the Department of Health
Lab, analysis of co-location / consolidation issues, estimate of
probable cost ($24 million), and conceptual massing illustration of
a possible 70,000 SF building.
IGC Superpower Super Conductor Production Clean
Room Program
Review
Hallam-ICS and Stenford Associates were retained to review
proposed improvements to a 5,900 SF cleanroom for prototype
production of 2nd generation high temperature superconducting
transmission cable. Review involved assessment of the proposed
facility configuration including process flow and separations,
associated testing limitations, cleanroom zoning, practice, access
and circulation.
Health Care
State of
Vermont Department of Health Rutland Regional Office Space Planning
Assessed existing and prepared alternate
configurations for improvement to 5,100 SF of offices and clinic
areas housing “Community Public Health” and “Children with Special
Health Needs” clinics.
Health Care and Rehabilitation Services
New White River Junction
Office Planning
Assessed possible suitability of several buildings for
7,000 SF community mental health service facilities program, and
prepared conceptual plan illustrating the issues affecting the reuse
of one of the sites.
Health Care & Rehabilitation Services
Community Mental Health
Clinic Facilities Planning Study & Action Plan
Prepared a plan for
consolidation and improved facilities for 42,500 SF of non-profit
community mental health treatment programs and associated
administrative functions from eight locations in three towns in
southeastern Vermont. Program called for 28,300 and 7,000 GSF in two
service regions. Analyzed current and consolidated program needs,
prepared conceptual plan for consolidated offices, and assessed
available sites. Prepared in two stages: facility study followed by
action plan.
US Veterans Health Administration
Outpatient Clinic Conceptual
Plan
Analyzed program and prepared plans for a new 9,950 SF
outpatient clinic. Acted as owner representative for VHA / Richmond
Group Partnership.
Sherman Hospital Operational Improvement Projects
Project
Management Services
For $7 million in projects at Sherman Hospital,
Elgin Ohio, including IT network installation
Government
State of Vermont Department of Education
Central
Office Facilities Planning
Analyzed issues and program requirements
for consolidation of central offices with 190 positions into 30,900
projected SF. Department offices had become cramped, divided and
poorly configured through years of making-do. The study required a
thorough inventory of existing work areas, detailed proposed program
and analysis of factors effecting the equitable projection of
sections needs.
State of Vermont Department of Labor
Central Office Consolidation
Planning
Analyzed program requirements and prepared alternate
conceptual layouts including individual workstations for
consolidation of offices from two locations housing 140 employees.
The work included preparation of conceptual layouts for Vermont
Interactive Television studio that was also to be co-located within
the available 38,400 SF.
State of Vermont Supreme Court & State Library
Facilities Planning
Study
Analysis of program needs and feasibility of renovating and
restructuring 52,000 SF of existing historic State Supreme Court
building and State Library areas so as to address crowding of court
offices and the need for consolidation without adversely impacting
the library’s functions.
State of Vermont Department of Health
Central Office Consolidation
& Reorganization Planning
Analyzed existing and newly leased
buildings, conducted user group meetings with multiple departments,
refined project scope definition and prepared conceptual layouts for
new and reconfigured area for central Department of Health offices affecting 238
employees.
State of Vermont Department of Health
White River Junction Office
Planning
Assessment of program needs, and preparation of concept
for expansion and reconfiguration of regional office.
State of Vermont Department of Motor Vehicles New Central Office
Facilities Planning Study
Prepared projection of space program
requirements for a possible new 47,000 SF central office. Included
discussion of associated functional and building requirements.
State of Vermont Banking, Securities and Health Care
Administration Facilities Reconfiguration Studies
Prepared several
studies over a period of years as BISHCA expanded: including analysis, recommendations and
conceptual plans for reorganization and expansion of 28,300 SF
of offices.
State of Vermont Buildings & General Services
Barre Courthouse and Office Building Space
Planning Study
Space programming and issue analysis including a
possible reuse scenario for 17,000 SF of Vermont State offices
including Corrections, Social and Rehabilitative Services, and
States Attorney
State of Vermont Buildings & General Services
Bennington State Office Building Space
Programming
Analysis and programming for
22,000 SF of renovation and expansion of a building to
house Vermont State offices in downtown Bennington.
State of Vermont Department of Aging & Disabilities
Studies for
Improved Space Utilization
Cost analysis, and scenarios for office workstation & record
storage reorganization for 7,300 SF of Vermont State offices.
State of Vermont Buildings & General Services
Brattleboro State Office Building Expansion
Feasibility Study
Prepared concepts for, and analysis of the issues
and probable costs of substantially expanding an existing 20,000 SF
Vermont State office building on a constrained site.
State of Vermont Agency of Natural Resources
Space Planning Study
Analysis and recommendations for improved space utilization of
124,000 net square feet of State of Vermont office space
State of Vermont Buildings & General Services
Capitol Complex
Space Reuse Study
Scenarios for reuse of 100,000 SF of Vermont
State buildings in Montpelier VT
Higher
Education
Dartmouth College Life Science Facilities Cost Study
Benchmarking of capital construction cost factors at peer colleges,
universities, and biotech facilities to provide financial comparison
for discussion of a roughly $100 million new research and teaching
facility.
Dartmouth College Residential Life Facilities Cost Study
Analysis
and benchmarking of capital construction cost factors affecting
residential life facility construction at 47 Colleges & Universities
Commercial
|